This project was carried out at The Gantry Hotel in Stratford and involved the removal, repair, and reinstallation of a major ventilation fan serving the hotel’s HVAC system. The fan motor had suffered a complete burnout, requiring a full rebuild by a specialist repair service and subsequent mechanical and electrical reinstallation on site.

Scope of Works

  • Removal of existing fan assembly and associated ductwork to allow full access.
  • Disconnection of electrical connections and safe extraction of the motor for off-site rebuild.
  • Temporary modification and marking of ducting components and fan blades to maintain correct balance and alignment during reassembly.
  • Installation of a rebuilt motor and reinstallation of the fan into the existing system.
  • Inclusion of acoustic baffles to reduce operational noise levels.

Challenges

  • Restricted access within the plant area required careful dismantling and reassembly of large components.
  • Ensuring precise rebalancing of fan blades and counterweights after reinstallation.
  • Coordinating between mechanical, electrical, and specialist motor rebuild teams to maintain tight scheduling.

Solutions and Approach

The team safely removed the fan from the ducting system and transported the burnt-out motor to a certified repair facility for a full rebuild. During removal, each fan blade and counterweight was clearly marked to ensure correct reassembly and optimal performance. Once the motor was returned, it was reinstalled and reconnected to the electrical system, with final alignment and balancing carried out on-site. Acoustic baffles were incorporated within the ducting to minimise sound transmission, ensuring quiet and efficient operation.

Results

The entire project was completed within a three-day window, including fan extraction, motor rebuild, and system reinstallation. The refurbished fan system restored full ventilation performance for the hotel and improved operational efficiency. The coordinated approach ensured minimal disruption to hotel operations while delivering a long-term, reliable solution.

IMG 0030
IMG 0123
IMG 0124
IMG 0125
IMG 0126
IMG 0127
IMG 0128
IMG 0129
IMG 0130
IMG 0135
IMG 0136
IMG 0138
IMG 0139
IMG 0141
IMG 0142
IMG 0143 2
IMG 0145
IMG 0146
IMG 0148
IMG 0150
IMG 0151

Get a free, no obligation quote.

We pride ourselves on rapid response times, understanding that your commercial gas needs often can’t wait. Our team are always happy to help and go the extra mile to ensure your complete satisfaction.

About Us

Solutions Built For Business. Delivered With Reliability.

Find out more

Case Studies

Successful projects and partnerships

Explore case studies