Project Overview

Bulstrode Park is a historic English country estate with an extensive park, situated southwest of Gerrards Cross in Buckinghamshire. The property spans the parishes of Chalfont St Peter, Gerrards Cross, and Fulmer, and its origins date back to before the Norman Conquest.

MEC Commercial Solutions was commissioned to undertake a full mechanical services strip-out and install a temporary plant room. The property is a Grade II listed manor house currently undergoing extensive renovation, so we were conscious to collaborate with other teams working on site.

The project involved the removal of all existing mechanical systems and the installation of a temporary biomass boiler plant to maintain heating and hot water supplies throughout the works.

Scope of Works

  • Full strip-out of the existing mechanical services within the manor house and associated plant rooms.
  • Supply, delivery, and installation of a temporary biomass boiler system to provide renewable heat during the renovation period.
  • Integration of a pellet storage and conveyor system, ensuring a continuous fuel supply to the biomass boilers.
  • Temporary plant room setup, including boiler room delivery, distribution pipework, and connection to existing systems.
  • Coordination with the main contractor and other trades to ensure minimal disruption across a busy site with full road and service access requirements.

Technical Details

  • Boiler Type: Temporary biomass boilers
  • Fuel System: Pellet-fed with tube-fed conveyor delivery system
  • Distribution: Complete temporary plant room distribution network designed and installed by MEC
  • Duration: 6 months, including temporary heating and hot water provision

Challenges and Solutions

Working within a historic property presented unique logistical and preservation challenges. MEC implemented a carefully planned strip-out to protect the existing structure, followed by the installation of a modular, self-contained plant room positioned to maintain access and service continuity throughout the works.

The temporary biomass system ensured the building remained operational with sustainable heating, aligning with modern energy standards while supporting the renovation programme.

Outcome

The project was completed on schedule, providing consistent heating and hot water throughout the six-month refurbishment period. The temporary biomass installation delivered both reliability and environmental performance, setting the foundation for future permanent renewable systems once the main works conclude.

IMG 0060
IMG 0061
IMG 0062
IMG 0063
IMG 0064
IMG 0065
IMG 0066
IMG 0067
IMG 0068
IMG 0069
IMG 0070
IMG 0071
IMG 0072
IMG 0073
IMG 0074
IMG 0076
IMG 0077
IMG 0080
IMG 0081
IMG 0082
IMG 0083

Get a free, no obligation quote.

We pride ourselves on rapid response times, understanding that your commercial gas needs often can’t wait. Our team are always happy to help and go the extra mile to ensure your complete satisfaction.

About Us

Solutions Built For Business. Delivered With Reliability.

Find out more

Case Studies

Successful projects and partnerships

Explore case studies